![]() |
![]() |
|||||||||||||||
| HOME | ABOUT US | SYSTEMS | MANUFACTURE | CONTACTS | ||||||||||||
|
Manufacture |
|||||||||||||||
![]() |
• Mining The Conveyor S13 Trestles, Drive & Transfer Tower & Gallery project comprised of 1200 tonne of trestles, towers and gallery steel work for the Darymple Bay Coal Terminal (DBCT), south of Mackay in Queensland. |
|||||||||||||||
| Click here for further details on this project | ||||||||||||||||
![]() |
• Warehousing The Fosters Distribution Warehouse, located in the DB RReef Industrial Estate off Boundary Road in Laverton North, is an impressive 52,808m2 facility inclusive of an Administration Office, Dispatch Office and Gatehouse. |
|||||||||||||||
| Click here for further details on this project | ||||||||||||||||
![]() |
• High-Rising The Deakin University carpark was a 500 tn project that had been awarded to Page Steel by Builder Wycome. Calling on expertise from previous multi story car park projects, Page Steel was able to adopt fabrication methods to help meet the proposed schedule. |
|||||||||||||||
| Click here for further details on this project | ||||||||||||||||
![]() |
• Engineering The exhaust stack was a large pipe fabrication especially designed to extract fumes from the Citylink tunnel. A high percentage of welds had to be inspected to meet the high standards required for this design. |
|||||||||||||||
| Click here for further details on this project | ||||||||||||||||
| Contacts | Site Map | Copyright © 2008. Page Steel Fabrications Site designed and maintained by AlltasksIT |
|||||||||||||||